* Astronomy

Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: GSAT 8


L

Posts: 131433
Date:
RE: GSAT 8
Permalink  
 


Signal acquired by Ascension island tracking station

__________________


L

Posts: 131433
Date:
Permalink  
 

Signal acquired by Natal tracking station


__________________


L

Posts: 131433
Date:
Permalink  
 

All systems nominal

__________________


L

Posts: 131433
Date:
Permalink  
 

The ARIANE 5 ECA rocket with the GSAT-8 and ST-2 satellites has successfully launched from Kourou, French Guiana

Image1ac.jpg



__________________


L

Posts: 131433
Date:
GSAT-8 and ST-2 satellites
Permalink  
 


All systems are go for launch



Attachments
__________________


L

Posts: 131433
Date:
RE: GSAT 8
Permalink  
 


GSAT-8 and ST-2 : Clouds over the launch site

__________________


L

Posts: 131433
Date:
GSAT-8 and ST-2 satellites
Permalink  
 


Ariane 5 is in the launch zone for Arianespace's dual-payload mission with GSAT-8 and ST-2

5740764166_6b66b69e2c.jpg

See more 



__________________


L

Posts: 131433
Date:
GSAT 8
Permalink  
 


Launch proceeding on schedule

Launch time: 20:38 GMT, 20th May, 2011



__________________


L

Posts: 131433
Date:
Permalink  
 

The Launch Readiness Review(RAL) took place in Kourou on Tuesday, May 17, 2011 and authorised count-down operations for the ST-2 & GSAT-8 launch.
Arianespace will orbit two communications satellites on its third launch of the year: ST-2 for the operator ST-2 Satellite Ventures Pte Ltd., a joint venture of Singapore Telecommunications Limited (SingTel) and Chunghwa Telecom Company Limited (Chunghwa), and GSAT-8 for the Indian Space Research Organisation (ISRO).

The ARIANE 5 ECA Launcher lift-off for this flight is scheduled on May 20, 2011 as soon as possible within the following launch window:

- Universal time (GMT): Between 08:38 pm and 10:10 pm on May 20, 2011
- Paris, France: Between 10:38 pm and 12:10 am on May 20-21, 2011
- Kourou, French Guiana: Between 05:38 pm and 07:10 pm on May 20, 2011
- Washington, D.C.: Between 04:38 pm and 06:10 pm on May 20, 2011

Source Arianespace



__________________


L

Posts: 131433
Date:
GSAT 8 satellite
Permalink  
 


The launch of the Arianespace Ariane 5 ECA rocket with the Insat 4G (GSAT 8) and ST-2 communications satellites has been rescheduled to the 19th May, 2011.



__________________
«First  <  1 2 3  >  Last»  | Page of 3  sorted by
 
Quick Reply

Please log in to post quick replies.



Create your own FREE Forum
Report Abuse
Powered by ActiveBoard