* Astronomy

Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: HOTBIRD7A


L

Posts: 131433
Date:
ARIANE5 Launch
Permalink  
 


The Arianespace's Ariane 5 ECA has been moved to the launch zone.
The lift-off with its SPAINSAT and HOT BIRD 7A dual-satellite payload is still scheduled for 22:06 to 23:13 UTC, 9th March.

__________________


L

Posts: 131433
Date:
Ariane 5 Launch
Permalink  
 


The launch of SPAINSAT – HOT BIRD 7A has been postponed to Thursday, March 9, 2006

Following the postponement of the launch slated for Friday, February 24, 2006, Alcatel Alenia Space has performed a complete verification of the telemetry signal system of Eutelsat's HOT BIRD 7A satellite. As a result the satellite was confirmed to be in perfect health and ready for launch.
On Saturday, February 25, the disconnection of a cryogenic purging umbilical line between the launch table mast and the launch vehicle led Arianespace to roll back the launch vehicle to the Final Assembly Building for the change of the faulty connector.

The launch is now scheduled during the night of Thursday, March 9, 2006, within the following launch window:

From 7:06 p.m. to 8:13 p.m., local time in Kourou, French Guiana
From 5:06 p.m. to 6:13 p.m. in Washington, D.C.
From 22:06 to 23:13 GMT
From 11:06 p.m. to 00:13 a.m. in Paris and Madrid

__________________


L

Posts: 131433
Date:
RE: HOTBIRD7A
Permalink  
 


Alcatel Alenia Space has satisfactorily completed a full verification of the telemetry signal system with Eutelsat’s HOT BIRDTM 7A satellite. The satellite was confirmed as a consequence to be in perfect health and ready for launch.

Arianespace has resumed launch operations, including a series of on-ground verifications, and will announce a new target launch date at the beginning of this week.

__________________


L

Posts: 131433
Date:
Permalink  
 

PRESS RELEASE
The launch of Eutelsat’s HOT BIRD 7A satellite, which was planned for February 24, 2006, has been postponed. At the request of Alcatel Alenia Space, a verification of the telemetry circuit is ongoing.

Arianespace has therefore decided to postpone the launch with the HOT BIRD 7A and SPAINSAT payloads.
A new launch date will be determined in the next few hours.

__________________


L

Posts: 131433
Date:
ARIANE5 Launch
Permalink  
 


Todays delay was due to a request by Alcatel Alenia Space to check the onboard telemetry circuits on the Hotbird7A satellite.

__________________


L

Posts: 131433
Date:
Ariane 5 Launch
Permalink  
 


Today's rescheduled launch of the Ariane 5 rocket has been postponed.
The reason for today's countdown halt has not been announced.

A new launch time will announced later.

__________________


L

Posts: 131433
Date:
RE: HOTBIRD7A
Permalink  
 


T minus 3 hours 20 minutes

Chilldown of Vulcain main stage engine

__________________


L

Posts: 131433
Date:
Permalink  
 

T minus 3 hours 30 minutes

The filling of main cryogenic stage with liquid oxygen and hydrogen is progressing on schedule.

__________________


L

Posts: 131433
Date:
Permalink  
 

T minus 4 hours
Countdown operations for the Ariane5 ECS launch has begun.


Credit Arianespace

The Launch Window is still set for between 22:11 to 23:21 GMT on February 24, 2006.

__________________


L

Posts: 131433
Date:
Ariane 5 ECA
Permalink  
 


Ariane 5 ECA:


__________________
«First  <  1 2 3 4 5  >  Last»  | Page of 5  sorted by
 
Quick Reply

Please log in to post quick replies.



Create your own FREE Forum
Report Abuse
Powered by ActiveBoard